|
Diggers Hotline
State law requires
anyone doing excavation work in Wisconsin to give at least three
working days notice to Diggers Hotline prior to digging. Diggers
Hotline is open 24 hours a day, 7 days a week, 365 days a year.
Toll Free (800) 242-8511. |
To Start Service at
Connected Site
To establish sewer & water service at a site that
is already connected to the sanitary sewer system, contact Judy Lee,
Deputy City Clerk, at (608) 326-6406 or
jlee@mhtc.net.
To End Service at
Connected Site
An owner or tenant of property supplied with sewer
& water may discontinue this service by calling the City and asking for
service to be discontinued. The minimum charge will continue to be
billed as long as the sewer & water remains connected, whether or not
any water is consumed.
Establishing a New
Connection Where None Exists
The City requires a Utility Permit and a $500 permit fee prior to
installation of new connections to the sanitary sewer system. Any
repairs to sanitary sewer lateral also require a permit, a $25 permit
fee, and an inspection. In addition, disconnecting sanitary sewer
service, such as when a building is razed, requires a permit, a $25
permit fee, and an inspection. Permits can be obtained by contacting
Julie Jackson, Municipal Technician, at City
Hall at (608) 326-8024 or
pdcjack@mhtc.net.
Effective January 1, 2007, all new sanitary sewer laterals require
the installation of a trace wire (see the link below for
specifications).
Trace Wire Requirements
Holding Tanks/Septic
Dumping Charges
The charge for dumping a holding tank from a
recreational vehicle, with a tank not exceeding 300 gallons, is $10.
Septic tank haulers pay $20 per dumping plus $40
for every 1000 gallons dumped.
Holding tank haulers pay $20 per dumping plus $10
for every 1000 gallons dumped.
Porta-potty tank haulers pay $20 for every 500
gallons dumped.
|